
Data Center Construction PMO Manager
Oracle
Columbus, Ohio

Oracle
Employer: Oracle. Job Description Serve as Oracle’s PMO Lead providing governance and oversight to the Developer-led program and GC delivery. Own the PMO cadence, integrated schedule alignment, and risk/change governance for Oracle’s interests, ensuring Oracle-specific gates—standards, InfoSec onboarding, LV/DCIM integrations, QA/QC, and commissioning acceptance—are fully embedded in Developer/GC plans. Act as the single source of truth for status and decisions, challenge assumptions where needed, and drive timely, documented resolutions. Partner with the Developer’s program team and GC to maintain scope discipline, protect lifecycle reliability and security requirements, and enable predictable design, procurement, construction, commissioning, and turnover outcomes that meet Oracle’s acceptance criteria. Responsibilities Key Responsibilities: - PMO governance and cadence - Establish and run the operating rhythm: weekly tactical, bi-weekly risk, monthly executive steering, and change control board (CCB) sessions. - Maintain PMO charters, RACI, decision logs, action trackers, and meeting artifacts; enforce single source of truth. - Integrated master schedule (IMS) and critical path - Own the IMS for Oracle scope; coordinate interfaces with GC’s schedule; ensure LV milestones, long-leads, FAT/SAT, and L1–L5 commissioning are fully integrated. - Drive look-ahead planning and float management; escalate threats to critical path with clear recovery options. - Risk and issue management - Maintain the joint risk/issue register; quantify cost/schedule/operability impacts; track mitigations and contingencies. - Lead top-risk reviews; ensure triggers and response plans are actionable and assigned. - Change control and scope governance - Chair or co-chair the CCB for Oracle-impacted changes; ensure CRs include technical, cost, schedule, and security assessments. - Prevent scope creep and enforce standards/acceptance criteria alignment; manage configuration control for drawings/s